Skip to content

Hot Repair

2017-2020 : JSC Zaporizhcoke
Complete re-bricking of 13 heating walls at coke-oven battery # 2
Scope of works:

  • Dismantling of refractory brickwork along the entire length of the coking chamber (32 flues).
  • Dismantling of refractory brickwork to the level of bricks on the reinforced concrete plate to a depth of four flues.
  • Erection works: replacement of buckstays, armour plates and reinforcement elements; replacement of gas offtake and gas supply valves and fittings; and adjustment of reinforcement elements.
  • Heating up and commissioning of ovens.

FSX Repair